Ammar Peter Kaka

1.7k total citations
69 papers, 1.4k citations indexed

About

Ammar Peter Kaka is a scholar working on Management Science and Operations Research, Building and Construction and Strategy and Management. According to data from OpenAlex, Ammar Peter Kaka has authored 69 papers receiving a total of 1.4k indexed citations (citations by other indexed papers that have themselves been cited), including 42 papers in Management Science and Operations Research, 25 papers in Building and Construction and 13 papers in Strategy and Management. Recurrent topics in Ammar Peter Kaka's work include Construction Project Management and Performance (40 papers), BIM and Construction Integration (22 papers) and Capital Investment and Risk Analysis (7 papers). Ammar Peter Kaka is often cited by papers focused on Construction Project Management and Performance (40 papers), BIM and Construction Integration (22 papers) and Capital Investment and Risk Analysis (7 papers). Ammar Peter Kaka collaborates with scholars based in United Kingdom, South Africa and United Arab Emirates. Ammar Peter Kaka's co-authors include Andrew Price, Henry Odeyinka, Farzad Khosrowshahi, Paul Bowen, Yahaya Makarfi Ibrahim, Abdelhalim Boussabaine, Emanuele Trucco, Paul Chan, John W. Lewis and Edward Finch and has published in prestigious journals such as SHILAP Revista de lepidopterología, Building and Environment and Automation in Construction.

In The Last Decade

Ammar Peter Kaka

65 papers receiving 1.2k citations

Peers

Ammar Peter Kaka
Irtishad Ahmad United States
Ming Sun United Kingdom
Henry Odeyinka United Kingdom
Eddy M. Rojas United States
Jasper Mbachu New Zealand
R. McCaffer United Kingdom
Syed M. Ahmed United States
Irtishad Ahmad United States
Ammar Peter Kaka
Citations per year, relative to Ammar Peter Kaka Ammar Peter Kaka (= 1×) peers Irtishad Ahmad

Countries citing papers authored by Ammar Peter Kaka

Since Specialization
Citations

This map shows the geographic impact of Ammar Peter Kaka's research. It shows the number of citations coming from papers published by authors working in each country. You can also color the map by specialization and compare the number of citations received by Ammar Peter Kaka with the expected number of citations based on a country's size and research output (numbers larger than one mean the country cites Ammar Peter Kaka more than expected).

Fields of papers citing papers by Ammar Peter Kaka

Since Specialization
Physical SciencesHealth SciencesLife SciencesSocial Sciences

This network shows the impact of papers produced by Ammar Peter Kaka. Nodes represent research fields, and links connect fields that are likely to share authors. Colored nodes show fields that tend to cite the papers produced by Ammar Peter Kaka. The network helps show where Ammar Peter Kaka may publish in the future.

Co-authorship network of co-authors of Ammar Peter Kaka

This figure shows the co-authorship network connecting the top 25 collaborators of Ammar Peter Kaka. A scholar is included among the top collaborators of Ammar Peter Kaka based on the total number of citations received by their joint publications. Widths of edges represent the number of papers authors have co-authored together. Node borders signify the number of papers an author published with Ammar Peter Kaka. Ammar Peter Kaka is excluded from the visualization to improve readability, since they are connected to all nodes in the network.

All Works

20 of 20 papers shown
2.
Bowen, Paul, et al.. (2011). Proposed Framework for Applying Cumulative Prospect Theory to an Unbalanced Bidding Model. Journal of Construction Engineering and Management. 137(12). 1052–1059. 16 indexed citations
3.
Bowen, Paul, et al.. (2010). The risks of unbalanced bidding. Construction Management and Economics. 28(4). 333–344. 25 indexed citations
4.
Kaka, Ammar Peter & Farzad Khosrowshahi. (2009). A mathematical‐based model for company‐level budgeting incorporating future unknown contracts. Engineering Construction & Architectural Management. 16(1). 48–60.
5.
Bowen, Paul, et al.. (2008). A simplified unbalanced bidding model. Construction Management and Economics. 26(12). 1283–1290. 40 indexed citations
6.
Ibrahim, Yahaya Makarfi, et al.. (2008). Towards automated progress assessment of workpackage components in construction projects using computer vision. Advanced Engineering Informatics. 23(1). 93–103. 113 indexed citations
7.
Chan, Paul & Ammar Peter Kaka. (2007). Productivity improvements: understand the workforce perceptions of productivity first. Personnel Review. 36(4). 564–584. 36 indexed citations
8.
Lewis, John A., et al.. (2004). Developing a framework for a standardized works programme for building projects. Construction Innovation. 4(4). 193–210. 1 indexed citations
9.
Kaka, Ammar Peter, et al.. (2004). Project Management Processes and the Achievement of Organiza\tional Strategies - The Case of Telecomm Operator. 2 indexed citations
10.
Trucco, Emanuele & Ammar Peter Kaka. (2004). A framework for automatic progress assessment on construction sites using computer vision. 2(2). 147–164. 19 indexed citations
11.
Kaka, Ammar Peter, et al.. (2003). FACTORS INFLUENCING THE SELECTION OF PAYMENT SYSTEMS IN CONSTRUCTION PROJECTS. 9 indexed citations
12.
Kaka, Ammar Peter. (2001). THE CASE FOR RE-ENGINEERING CONTRACT PAYMENT MECHANISMS. 6 indexed citations
13.
Kaka, Ammar Peter & Nashwan Dawood. (2000). Assessing the Need to Consider Cash Flow as a Factor in Deciding What type of Procurement System the Client Should Implement. 4 indexed citations
14.
Kaka, Ammar Peter. (1999). The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering Construction & Architectural Management. 6(3). 256–266. 3 indexed citations
15.
Boussabaine, Abdelhalim & Ammar Peter Kaka. (1998). A neural networks approach for cost flow forecasting. Construction Management and Economics. 16(4). 471–479. 85 indexed citations
16.
Kaka, Ammar Peter, et al.. (1997). Development and Implementation of a System of Financial Planning and Control for a Medium Sized Building Contractor. Journal of Financial Management of Property and Construction. 2(1). 5–34. 1 indexed citations
17.
Kaka, Ammar Peter. (1996). Towards more flexible and accurate cash flow forecasting. Construction Management and Economics. 14(1). 35–44. 39 indexed citations
18.
Kaka, Ammar Peter. (1994). Contractors’ financial budgeting using computer simulation. Construction Management and Economics. 12(2). 113–124. 13 indexed citations
19.
Kaka, Ammar Peter & Andrew Price. (1991). Net cashflow models: Are they reliable?. Construction Management and Economics. 9(3). 291–308. 54 indexed citations
20.
Kaka, Ammar Peter & Andrew Price. (1991). Relationship between value and duration of construction projects. Construction Management and Economics. 9(4). 383–400. 102 indexed citations

Rankless uses publication and citation data sourced from OpenAlex, an open and comprehensive bibliographic database. While OpenAlex provides broad and valuable coverage of the global research landscape, it—like all bibliographic datasets—has inherent limitations. These include incomplete records, variations in author disambiguation, differences in journal indexing, and delays in data updates. As a result, some metrics and network relationships displayed in Rankless may not fully capture the entirety of a scholar's output or impact.

Explore authors with similar magnitude of impact

Rankless by CCL
2026