Maged Georgy
About
In The Last Decade
Maged Georgy
36 papers receiving 764 citations
Peers
Comparison fields: 5 of 84
- Building and Construction 481
- Management Science and Operations Research 464
- Industrial and Manufacturing Engineering 157
- Strategy and Management 154
- Radiological and Ultrasound Technology 103
Countries citing papers authored by Maged Georgy
This map shows the geographic impact of Maged Georgy's research. It shows the number of citations coming from papers published by authors working in each country. You can also color the map by specialization and compare the number of citations received by Maged Georgy with the expected number of citations based on a country's size and research output (numbers larger than one mean the country cites Maged Georgy more than expected).
Fields of papers citing papers by Maged Georgy
This network shows the impact of papers produced by Maged Georgy. Nodes represent research fields, and links connect fields that are likely to share authors. Colored nodes show fields that tend to cite the papers produced by Maged Georgy. The network helps show where Maged Georgy may publish in the future.
Co-authorship network of co-authors of Maged Georgy
This figure shows the co-authorship network connecting the top 25 collaborators of Maged Georgy. A scholar is included among the top collaborators of Maged Georgy based on the total number of citations received by their joint publications. Widths of edges represent the number of papers authors have co-authored together. Node borders signify the number of papers an author published with Maged Georgy. Maged Georgy is excluded from the visualization to improve readability, since they are connected to all nodes in the network.
All Works
| # | Work | Indexed citations |
|---|---|---|
| 1 | 4 | |
| 2 | 8 | |
| 3 | 0 | |
| 4 | 19 | |
| 5 | 2 | |
| 6 | 0 | |
| 7 | Applicability of critical chain scheduling in construction projects: an investigation in the Middle East | 0 |
| 8 | Sustainable construction modelling: a systems engineering approach | 3 |
| 9 | Analogy-based ranking of delay causes: an outlook for future projects | 1 |
| 10 | A comprehensive cash management model for construction projects using ant colony optimization | 1 |
| 11 | Use of case libraries for cost estimating in bridge management systems | 1 |
| 12 | A proposed bridge management system for Egypt | 0 |
| 13 | Engineering performance in the US industrial construction sector | 5 |
| 14 | 7 | |
| 15 | 9 | |
| 16 | Towards a more applicable set of sustainable construction practices | 1 |
| 17 | 126 | |
| 18 | An automated system for dynamic construction site layout planning | 9 |
| 19 | 6 | |
| 20 | 9 |
Rankless uses publication and citation data sourced from OpenAlex, an open and comprehensive bibliographic database. While OpenAlex provides broad and valuable coverage of the global research landscape, it—like all bibliographic datasets—has inherent limitations. These include incomplete records, variations in author disambiguation, differences in journal indexing, and delays in data updates. As a result, some metrics and network relationships displayed in Rankless may not fully capture the entirety of a scholar's output or impact.