Yvan J. Beliveau
- Building and Construction top 1%
- Management Science and Operations Research top 2%
- Industrial and Manufacturing Engineering top 2%
- Mechanical Engineering
- Renewable Energy, Sustainability and the Environment
- Co-authors
- Walid ThabetMarwa HassanPardis Pishdad-BozorgiGeorg ReichardKhaled NassarQian ChenSvetlana OlbinaMichael C. Vorster
- Topics
- BIM and Construction Integration (27 papers)Manufacturing Process and Optimization (8 papers)Construction Project Management and Performance (8 papers)
- Cited by
- Building and ConstructionManagement Science and Operations ResearchIndustrial and Manufacturing Engineering
- Partner nations
- United StatesAustralia
In The Last Decade
Yvan J. Beliveau
51 papers receiving 790 citations
Peers
Comparison fields: 5 of 82
- Building and Construction 558
- Management Science and Operations Research 366
- Industrial and Manufacturing Engineering 186
- Mechanical Engineering 115
- Renewable Energy, Sustainability and the Environment 80
Countries citing papers authored by Yvan J. Beliveau
This map shows the geographic impact of Yvan J. Beliveau's research. It shows the number of citations coming from papers published by authors working in each country. You can also color the map by specialization and compare the number of citations received by Yvan J. Beliveau with the expected number of citations based on a country's size and research output (numbers larger than one mean the country cites Yvan J. Beliveau more than expected).
Fields of papers citing papers by Yvan J. Beliveau
This network shows the impact of papers produced by Yvan J. Beliveau. Nodes represent research fields, and links connect fields that are likely to share authors. Colored nodes show fields that tend to cite the papers produced by Yvan J. Beliveau. The network helps show where Yvan J. Beliveau may publish in the future.
Co-authorship network of co-authors of Yvan J. Beliveau
This figure shows the co-authorship network connecting the top 25 collaborators of Yvan J. Beliveau. A scholar is included among the top collaborators of Yvan J. Beliveau based on the total number of citations received by their joint publications. Widths of edges represent the number of papers authors have co-authored together. Node borders signify the number of papers an author published with Yvan J. Beliveau. Yvan J. Beliveau is excluded from the visualization to improve readability, since they are connected to all nodes in the network.
All Works
| # | Work | Indexed citations |
|---|---|---|
| 1 | 18 | |
| 2 | Vertically Integrating a Capstone Experience: A Case Study for a New Strategy | 3 |
| 3 | 1 | |
| 4 | 2 | |
| 5 | 21 | |
| 6 | 25 | |
| 7 | VALUE-ADDED CUSTOMER SERVICE THROUGH MASS CUSTOMIZATION AND DESIGN FOR MANUFACTURING IN U.S. PRODUCTION HOMEBUILDING | 1 |
| 8 | INTERFACE MANAGEMENT—A FACILITATOR OF LEAN CONSTRUCTION AND AGILE PROJECT MANAGEMENT | 41 |
| 9 | An integrated design and control strategy for energy-efficient buildings | 2 |
| 10 | The Development of a Vertically and Horizontally Integrated Undergraduate Building Construction Curriculum for the Twenty-First Century | 4 |
| 11 | 6 | |
| 12 | Representation of Vertical Constraints Knowledge for Scheduling Multi-Story Projects | 1 |
| 13 | 55 | |
| 14 | CAD Applications for Material Handling in the Construction Environment | 2 |
| 15 | A Model to Quantify Work Space Availability for Space—Contrained Scheduling Within a CAD Environment | 1 |
| 16 | Real-Time Position Measurement Integrated with CAD-CAE and Related Data Structure Issues | 1 |
| 17 | LINEAR SCHEDULING AND VISUALIZATION | 40 |
| 18 | 3-D Positioning for Construction Surveying and Automation | 6 |
| 19 | 2 | |
| 20 | Automated Position and Control Systems Using Lasers and Electromagnetic Signals | 1 |
About Yvan J. Beliveau
Yvan J. Beliveau is a scholar working on Building and Construction, Industrial and Manufacturing Engineering and Management Science and Operations Research, having authored 53 papers that have together received 882 indexed citations. Recurring topics across this work include BIM and Construction Integration (27 papers), Manufacturing Process and Optimization (8 papers) and Construction Project Management and Performance (8 papers). The work is most often cited by research in Building and Construction (558 citations), Management Science and Operations Research (366 citations) and Industrial and Manufacturing Engineering (186 citations). Yvan J. Beliveau has collaborated with scholars based in United States and Australia. Frequent co-authors include Walid Thabet, Marwa Hassan, Pardis Pishdad-Bozorgi, Georg Reichard, Khaled Nassar, Qian Chen, Svetlana Olbina, Michael C. Vorster, H.F. VanLandingham and Qian Chen. Their work appears in journals such as Construction and Building Materials, Building and Environment and Automation in Construction.
Rankless uses publication and citation data sourced from OpenAlex, an open and comprehensive bibliographic database. While OpenAlex provides broad and valuable coverage of the global research landscape, it—like all bibliographic datasets—has inherent limitations. These include incomplete records, variations in author disambiguation, differences in journal indexing, and delays in data updates. As a result, some metrics and network relationships displayed in Rankless may not fully capture the entirety of a scholar's output or impact.