Yasser Mohamed

2.2k total citations
98 papers, 1.7k citations indexed

About

Yasser Mohamed is a scholar working on Building and Construction, Management Science and Operations Research and Industrial and Manufacturing Engineering. According to data from OpenAlex, Yasser Mohamed has authored 98 papers receiving a total of 1.7k indexed citations (citations by other indexed papers that have themselves been cited), including 72 papers in Building and Construction, 42 papers in Management Science and Operations Research and 37 papers in Industrial and Manufacturing Engineering. Recurrent topics in Yasser Mohamed's work include BIM and Construction Integration (72 papers), Construction Project Management and Performance (17 papers) and Advanced Manufacturing and Logistics Optimization (17 papers). Yasser Mohamed is often cited by papers focused on BIM and Construction Integration (72 papers), Construction Project Management and Performance (17 papers) and Advanced Manufacturing and Logistics Optimization (17 papers). Yasser Mohamed collaborates with scholars based in Canada, Iran and United States. Yasser Mohamed's co-authors include Simaan AbouRizk, Ulrich Hermann, Hosein Taghaddos, Lingguang Song, Sang Hyun Lee, Mohamed Al‐Hussein, Darren Halpin, SangUk Han, Feniosky Peña‐Mora and Siri Fernando and has published in prestigious journals such as SHILAP Revista de lepidopterología, Accident Analysis & Prevention and Automation in Construction.

In The Last Decade

Yasser Mohamed

93 papers receiving 1.6k citations

Peers

Yasser Mohamed
Rifat Sönmez Türkiye
Amr Kandil United States
Daniel W. Halpin United States
Julio C. Martínez United States
Jesús M. de la Garza United States
Yasser Mohamed
Citations per year, relative to Yasser Mohamed Yasser Mohamed (= 1×) peers Ronie Navon

Countries citing papers authored by Yasser Mohamed

Since Specialization
Citations

This map shows the geographic impact of Yasser Mohamed's research. It shows the number of citations coming from papers published by authors working in each country. You can also color the map by specialization and compare the number of citations received by Yasser Mohamed with the expected number of citations based on a country's size and research output (numbers larger than one mean the country cites Yasser Mohamed more than expected).

Fields of papers citing papers by Yasser Mohamed

Since Specialization
Physical SciencesHealth SciencesLife SciencesSocial Sciences

This network shows the impact of papers produced by Yasser Mohamed. Nodes represent research fields, and links connect fields that are likely to share authors. Colored nodes show fields that tend to cite the papers produced by Yasser Mohamed. The network helps show where Yasser Mohamed may publish in the future.

Co-authorship network of co-authors of Yasser Mohamed

This figure shows the co-authorship network connecting the top 25 collaborators of Yasser Mohamed. A scholar is included among the top collaborators of Yasser Mohamed based on the total number of citations received by their joint publications. Widths of edges represent the number of papers authors have co-authored together. Node borders signify the number of papers an author published with Yasser Mohamed. Yasser Mohamed is excluded from the visualization to improve readability, since they are connected to all nodes in the network.

All Works

20 of 20 papers shown
1.
Lefsrud, Lianne, et al.. (2025). Integrating knowledge management and large language models to advance construction Job Hazard Analysis: A systematic review and conceptual framework. SHILAP Revista de lepidopterología. 2(3). 156–170. 1 indexed citations
2.
Wen, He, Simaan AbouRizk, & Yasser Mohamed. (2025). Using Large Language Models to Identify Project Risks for Sustainable Operations. Purdue e-Pubs (Purdue University System). 1(1). 1 indexed citations
3.
Wen, He, Simaan AbouRizk, & Yasser Mohamed. (2025). Gap Analysis of Digitalization Levels in Construction and Manufacturing: A Comparative Study of Construction 4.0 and Industry 4.0. Journal of Construction Engineering and Management. 151(3). 2 indexed citations
4.
Mohamed, Yasser, et al.. (2023). Simulation-Assisted Project Data Integration for Development and Analysis of As-Built Schedules. Buildings. 13(4). 974–974.
5.
Darwish, M.A., et al.. (2020). Integrated Simulation and Lean Approach for Production Line Improvement in a Prefabricated Panelized Homebuilding Facility. Annual Conference of the International Group for Lean Construction. 661–672. 5 indexed citations
6.
Bouferguène, Ahmed, et al.. (2020). Industrial pipelines data generator. SHILAP Revista de lepidopterología. 32. 106275–106275. 2 indexed citations
7.
Mohamed, Yasser, et al.. (2016). Modelling hauler movement in a distributed simulation of earthmoving operations. 2(3/4). 226–226. 1 indexed citations
8.
Westover, Lindsey, et al.. (2014). Analysis of rigging assembly for lifting heavy industrial modules. Canadian Journal of Civil Engineering. 41(6). 512–522. 7 indexed citations
9.
Mohamed, Yasser, et al.. (2013). Time-stepped, simulation-based scheduling system for large-scale industrial construction projects. Winter Simulation Conference. 3249–3256. 3 indexed citations
10.
Mohamed, Yasser, et al.. (2012). A Semantic Approach to Representation, Sharing, and Discovery of Construction Simulation Models. Construction Research Congress 2012. 12. 591–601. 2 indexed citations
11.
Mohamed, Yasser, et al.. (2011). APPLICATION OF GAMING ENGINES IN SIMULATION DRIVEN VISUALIZATION OF CONSTRUCTION OPERATIONS. Journal of Information Technology in Construction. 16(3). 23–38. 17 indexed citations
12.
Mohamed, Yasser, et al.. (2011). Loosely coupled visualization of industrial construction simulation using a gaming engine. Winter Simulation Conference. 3582–3592. 2 indexed citations
13.
AbouRizk, Simaan, et al.. (2010). Developing complex distributed simulation for industrial plant construction using high level architecture. Winter Simulation Conference. 3177–3188. 7 indexed citations
14.
AbouRizk, Simaan, et al.. (2010). An HLA-based bidding game with intelligent virtual player. Winter Simulation Conference. 3056–3068. 1 indexed citations
15.
Hu, Di & Yasser Mohamed. (2010). State-Based Simulation Mechanism for Facilitating Project Schedule Updating. 369–378. 9 indexed citations
16.
Yang, Liu & Yasser Mohamed. (2008). Multi-agent resource allocation (MARA) for modeling construction processes. Winter Simulation Conference. 2361–2369. 10 indexed citations
17.
AbouRizk, Simaan, et al.. (2007). A simulation-based framework for quantifying the cold regions weather impacts on construction schedules. Winter Simulation Conference. 1798–1804. 8 indexed citations
18.
Mohamed, Yasser, et al.. (2004). Simulation input updating using Bayesian techniques. Winter Simulation Conference. 2. 1238–1243. 10 indexed citations
19.
Mohamed, Yasser, et al.. (2002). CEPM 1: special purpose simulation modeling of tower cranes. Winter Simulation Conference. 1709–1715. 3 indexed citations
20.
AbouRizk, Simaan & Yasser Mohamed. (2000). Simphony: an integrated environment for construction simulation. Winter Simulation Conference. 2. 1907–1914. 71 indexed citations

Rankless uses publication and citation data sourced from OpenAlex, an open and comprehensive bibliographic database. While OpenAlex provides broad and valuable coverage of the global research landscape, it—like all bibliographic datasets—has inherent limitations. These include incomplete records, variations in author disambiguation, differences in journal indexing, and delays in data updates. As a result, some metrics and network relationships displayed in Rankless may not fully capture the entirety of a scholar's output or impact.

Explore authors with similar magnitude of impact

Rankless by CCL
2026