Enrique Gerstl

469 total citations
27 papers, 353 citations indexed

About

Enrique Gerstl is a scholar working on Industrial and Manufacturing Engineering, Computer Networks and Communications and Management Information Systems. According to data from OpenAlex, Enrique Gerstl has authored 27 papers receiving a total of 353 indexed citations (citations by other indexed papers that have themselves been cited), including 27 papers in Industrial and Manufacturing Engineering, 18 papers in Computer Networks and Communications and 6 papers in Management Information Systems. Recurrent topics in Enrique Gerstl's work include Scheduling and Optimization Algorithms (27 papers), Optimization and Search Problems (18 papers) and Advanced Manufacturing and Logistics Optimization (16 papers). Enrique Gerstl is often cited by papers focused on Scheduling and Optimization Algorithms (27 papers), Optimization and Search Problems (18 papers) and Advanced Manufacturing and Logistics Optimization (16 papers). Enrique Gerstl collaborates with scholars based in Israel and United States. Enrique Gerstl's co-authors include Gur Mosheiov, Baruch Mor, Assaf Sarig, Mikhail Y. Kovalyov, Sergey Kovalev, Gur Mosheiov and Dvir Shabtay and has published in prestigious journals such as European Journal of Operational Research, International Journal of Production Economics and Journal of the Operational Research Society.

In The Last Decade

Enrique Gerstl

26 papers receiving 324 citations

Peers

Enrique Gerstl
Kabir Rustogi United Kingdom
J-B Wang China
Na Yin China
Xue Huang China
Kabir Rustogi United Kingdom
Enrique Gerstl
Citations per year, relative to Enrique Gerstl Enrique Gerstl (= 1×) peers Kabir Rustogi

Countries citing papers authored by Enrique Gerstl

Since Specialization
Citations

This map shows the geographic impact of Enrique Gerstl's research. It shows the number of citations coming from papers published by authors working in each country. You can also color the map by specialization and compare the number of citations received by Enrique Gerstl with the expected number of citations based on a country's size and research output (numbers larger than one mean the country cites Enrique Gerstl more than expected).

Fields of papers citing papers by Enrique Gerstl

Since Specialization
Physical SciencesHealth SciencesLife SciencesSocial Sciences

This network shows the impact of papers produced by Enrique Gerstl. Nodes represent research fields, and links connect fields that are likely to share authors. Colored nodes show fields that tend to cite the papers produced by Enrique Gerstl. The network helps show where Enrique Gerstl may publish in the future.

Co-authorship network of co-authors of Enrique Gerstl

This figure shows the co-authorship network connecting the top 25 collaborators of Enrique Gerstl. A scholar is included among the top collaborators of Enrique Gerstl based on the total number of citations received by their joint publications. Widths of edges represent the number of papers authors have co-authored together. Node borders signify the number of papers an author published with Enrique Gerstl. Enrique Gerstl is excluded from the visualization to improve readability, since they are connected to all nodes in the network.

All Works

20 of 20 papers shown
1.
Shabtay, Dvir & Enrique Gerstl. (2024). Coordinating scheduling and rejection decisions in a two-machine flow shop scheduling problem. European Journal of Operational Research. 316(3). 887–898. 3 indexed citations
2.
Gerstl, Enrique & Gur Mosheiov. (2024). Minimizing the number of tardy jobs with generalized due-dates and position-dependent processing times. Optimization Letters. 19(4). 833–845. 4 indexed citations
3.
Gerstl, Enrique & Gur Mosheiov. (2023). The LPT heuristic for minimizing total load on a proportionate openshop. Discrete Applied Mathematics. 338. 190–198.
4.
Gerstl, Enrique & Gur Mosheiov. (2020). The single machine CON problem with unavailability period. International Journal of Production Research. 59(3). 824–838. 7 indexed citations
5.
Gerstl, Enrique & Gur Mosheiov. (2020). Single machine scheduling to maximize the number of on-time jobs with generalized due-dates. Journal of Scheduling. 23(3). 289–299. 16 indexed citations
6.
Gerstl, Enrique, Baruch Mor, & Gur Mosheiov. (2018). Scheduling on a proportionate flowshop to minimise total late work. International Journal of Production Research. 57(2). 531–543. 25 indexed citations
7.
Gerstl, Enrique & Gur Mosheiov. (2017). Minmax weighted earliness-tardiness with identical processing times and two competing agents. Computers & Industrial Engineering. 107. 171–177. 3 indexed citations
8.
Gerstl, Enrique, Baruch Mor, & Gur Mosheiov. (2017). Minmax scheduling with acceptable lead-times: Extensions to position-dependent processing times, due-window and job rejection. Computers & Operations Research. 83. 150–156. 28 indexed citations
9.
Gerstl, Enrique, Baruch Mor, & Gur Mosheiov. (2016). Minmax scheduling with acceptable lead-times: Extensions to position-dependent processing times, due-window and job rejection. 39–41. 8 indexed citations
10.
Gerstl, Enrique, Baruch Mor, & Gur Mosheiov. (2016). Scheduling with two competing agents to minimize total weighted earliness. Annals of Operations Research. 253(1). 227–245. 2 indexed citations
11.
Gerstl, Enrique & Gur Mosheiov. (2015). Scheduling with a due-window for acceptable lead-times. Journal of the Operational Research Society. 66(9). 1578–1588. 12 indexed citations
12.
Gerstl, Enrique, Baruch Mor, & Gur Mosheiov. (2014). A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop. Information Processing Letters. 115(2). 159–162. 18 indexed citations
13.
Gerstl, Enrique & Gur Mosheiov. (2014). A two-stage flexible flow shop problem with unit-execution-time jobs and batching. International Journal of Production Economics. 158. 171–178. 3 indexed citations
14.
Gerstl, Enrique, Gur Mosheiov, & Assaf Sarig. (2014). Batch Scheduling In A Two-Stage Flexible Flow Shop Problem. Foundations of Computing and Decision Sciences. 39(1). 3–16. 11 indexed citations
15.
Gerstl, Enrique & Gur Mosheiov. (2013). The optimal number of used machines in a two-stage flexible flowshop scheduling problem. Journal of Scheduling. 17(2). 199–210. 11 indexed citations
16.
Gerstl, Enrique & Gur Mosheiov. (2013). Single machine just‐in‐time scheduling problems with two competing agents. Naval Research Logistics (NRL). 61(1). 1–16. 26 indexed citations
17.
Gerstl, Enrique & Gur Mosheiov. (2013). Minmax due-date assignment with a time window for acceptable lead-times. Annals of Operations Research. 211(1). 167–177. 15 indexed citations
18.
Gerstl, Enrique & Gur Mosheiov. (2013). A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines. International Journal of Production Economics. 146(1). 161–166. 10 indexed citations
19.
Gerstl, Enrique & Gur Mosheiov. (2012). Scheduling problems with two competing agents to minimized weighted earliness–tardiness. Computers & Operations Research. 40(1). 109–116. 40 indexed citations
20.
Gerstl, Enrique & Gur Mosheiov. (2012). Scheduling on parallel identical machines with job-rejection and position-dependent processing times. Information Processing Letters. 112(19). 743–747. 24 indexed citations

Rankless uses publication and citation data sourced from OpenAlex, an open and comprehensive bibliographic database. While OpenAlex provides broad and valuable coverage of the global research landscape, it—like all bibliographic datasets—has inherent limitations. These include incomplete records, variations in author disambiguation, differences in journal indexing, and delays in data updates. As a result, some metrics and network relationships displayed in Rankless may not fully capture the entirety of a scholar's output or impact.

Explore authors with similar magnitude of impact

Rankless by CCL
2026