Immediate Impact
59 standout
Citing Papers
Machine-fixture-pallet resources constrained flexible job shop scheduling considering loading and unloading times under pallet automation system
2024 Standout
The flexible job shop scheduling problem: A review
2023 Standout
Works of Yahya Fathi being referenced
A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities
2003
Heuristic procedures for the parallel machine problem with tool switches
2002
Author Peers
| Author | Last Decade | Papers | Cites | |||
|---|---|---|---|---|---|---|
| Yahya Fathi | 272 | 106 | 124 | 58 | 509 | |
| Christoph Buchheim | 149 | 90 | 185 | 68 | 523 | |
| Kim Allan Andersen | 150 | 81 | 144 | 27 | 489 | |
| Harvey M. Salkin | 350 | 70 | 93 | 23 | 550 | |
| Dennis L. Bricker | 110 | 126 | 113 | 35 | 542 | |
| Jordi Castro | 93 | 52 | 177 | 46 | 496 | |
| Xiaojin Zheng | 68 | 125 | 106 | 27 | 420 | |
| Boglárka G.-Tóth | 135 | 29 | 155 | 40 | 525 | |
| Thomas Stidsen | 210 | 218 | 118 | 43 | 508 | |
| Wenxun Xing | 181 | 35 | 174 | 48 | 427 | |
| Eduardo Conde | 176 | 248 | 90 | 36 | 558 |
All Works
Login with ORCID to disown or claim papers
Loading papers...