Citation Impact
Citing Papers
Solving the Quay Crane Scheduling Problem Using Genetic Algorithm in MATLAB
2012
Introduction, comparison, and validation of Meta‐Essentials : A free and simple tool for meta‐analysis
2017 Standout
The circular economy: New or Refurbished as CE 3.0? — Exploring Controversies in the Conceptualization of the Circular Economy through a Focus on History and Resource Value Retention Options
2017 Standout
Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future
2014 Standout
Sustainable supply chain management: Review and research opportunities
2011
An analysis of remanufacturing practices in Japan
2011
The complexity of two group scheduling problems
2002
Sustainable supply chains: An introduction
2007 Standout
Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
2009
A review on genetic algorithm: past, present, and future
2020 Standout
The impact of information technology on supply chain capabilities and firm performance: A resource-based view
2005 Standout
e‐Business and Supply Chain Management
2002
A heuristic approach for single-machine scheduling with due dates and class setups
2001
One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objective
2004
A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time
2003
Supply chain risk analysis with mean-variance models: a technical review
2013
Intention to buy eco-friendly packaged products among young consumers of India: A study on developing nation
2016 Standout
Batching in a two-stage flowshop with dedicated machines in the second stage
2004
Intelligent service capacity allocation for cross-border-E-commerce related third-party-forwarding logistics operations: A deep learning approach
2020 Standout
Coordination of a supply chain with consumer return under demand uncertainty
2009
Efficient multi-population outpost fruit fly-driven optimizers: Framework and advances in support vector machines
2019 Standout
One-Operator, Two-Machine Open Shop And Flow Shop Scheduling With Setup Times For Machines And Maximum Lateness Objective
2003
Proactive vs. reactive order-fulfillment resource allocation for sea-based logistics
2018
Supply Chain Coordination Under Channel Rebates with Sales Effort Effects
2002
A literature review and a case study of sustainable supply chains with a focus on metrics
2012 Standout
Artificial intelligence in drug discovery and development
2020 Standout
Coordination of Supply Chains with Risk‐Averse Agents
2004
Service supply chain management: A review of operational models
2015
Risk Ownership in Contract Manufacturing
2007
Single machine batch scheduling with sequential job processing
2001
A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines
2004
A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
2014 Standout
Supply chain risk management: present and future scope
2012
Literature review of Industry 4.0 and related technologies
2018 Standout
From a literature review to a conceptual framework for sustainable supply chain management
2008 Standout
Importance of closed-loop supply chain relationships for product remanufacturing
2008
A comparative analysis of greening policies across supply chain structures
2011
Mean–variance analysis of the newsvendor model with stockout cost☆
2008
Role of big data analytics in developing sustainable capabilities
2018 Standout
Supplier Opportunism in Buyer–Supplier New Product Development: A China‐U.S. Study of Antecedents, Consequences, and Cultural/Institutional Contexts
2015
The optimization of the closed-loop supply chain network
2008
Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops
2001
Recent applications of big data analytics in railway transportation systems: A survey
2018 Standout
Two-machine flowshop scheduling with job class setups to minimize total flowtime
2004
Single machine batch scheduling with resource dependent setup and processing times
2001
Joint determination of inventory replenishment and sales effort with uncertain market responses
2009
Cross-border B2C e-commerce to Greater China and the role of logistics: a literature review
2017 Standout
Deep learning for smart manufacturing: Methods and applications
2018 Standout
Open Business Models and Closed-Loop Value Chains: Redefining the Firm-Consumer Relationship
2016
Scheduling on a single machine with family setups to minimize total tardiness
2005
Minimizing L max for the single machine scheduling problem with family set-ups
2004
A survey of berth allocation and quay crane scheduling problems in container terminals
2009 Standout
Improved dynamic programs for some batching problems involving the maximum lateness criterion
2000
Personnel scheduling: A literature review
2012 Standout
1 Blockchain’s roles in meeting key supply chain management objectives
2017 Standout
Quay crane scheduling in container terminals
2006
Implementation of reverse logistics as a sustainable tool for raw material purchasing in developing countries: The case of Venezuela
2012
Batching decisions for assembly production systems
2003
Industry 4.0 technologies: Implementation patterns in manufacturing companies
2019 Standout
Scheduling with batching: A review
2000
A comprehensive review of big data analytics throughout product lifecycle to support sustainable smart manufacturing: A framework, challenges and future research directions
2018 Standout
The influence of greening the suppliers and green innovation on environmental performance and competitive advantage in Taiwan
2011 Standout
A note on the single machine serial batching scheduling problem to minimize maximum lateness with precedence constraints
2002
A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size
1999
Operations research at container terminals: a literature update
2007 Standout
A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times
2000
Coordination of channel members’ efforts and utilities in contract farming operations
2016 Standout
Identical parallel machine scheduling to minimise makespan and total weighted completion time: a column generation approach
2013
Joint procurement and production decisions in remanufacturing under quality and demand uncertainty
2008
A framework for research in reverse logistics
2010
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
2004
Lower bounds and algorithms for flowtime minimization on a single machine with set-up times
2000
The Implications of Pooled Returns Policies
2005
Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs
2003
DISCRETE TIME PARALLEL-MACHINE SCHEDULING: A CASE OF SHIP SCHEDULING
1996
A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints
2016
Single machine batch scheduling with jointly compressible setup and processing times
2003
Optimal scheduling of two-component products on a single facility
2004
Ship routing and scheduling in the new millennium
2012 Standout
Information Production and Capital Allocation: Decentralized versus Hierarchical Firms
2002 Standout
Parallel machine scheduling by family batching with sequence-independent set-up times
2006
Minimizing maximum lateness with job families
2000
Issues in reverse supply chains, part II: reverse distribution issues – an overview
2008
Supply Chain Coordination with Revenue-Sharing Contracts: Strengths and Limitations
2005 Standout
Perspectives in reverse logistics: A review
2009
Issues in reverse supply chains, part I: end‐of‐life product recovery and inventory management – an overview
2008
Exact algorithms for scheduling multiple families of jobs on parallel machines
2003
Makespan minimization in the two‐machine flowshop batch scheduling problem
2000
The resource‐based view within the conversation of strategic management
1992 Standout
A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing times
2003
Integrated Sustainable Life Cycle Design: A Review
2010
Invited Editorial: A Natural-Resource-Based View of the Firm
2010 Standout
Supply chain coordination with risk sensitive retailer under target sales rebate
2011
Perspectives in supply chain risk management
2006 Standout
Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines
2003
Designing a reverse logistics network for optimal collection, recovery and quality-based product-mix planning
2011
Performance measurement of sustainable supply chains
2013
The impact of sharing customer returns information in a supply chain with and without a buyback policy
2011
On Minimizing Total Tardiness in a Serial Batching Problem
2001
Heuristic procedures for scheduling job families with setups and due dates
1999
Empirical investigation of data analytics capability and organizational flexibility as complements to supply chain resilience
2019 Standout
Multi-dimensional circular supply chain management: A comparative review of the state-of-the-art practices and research
2021
Actions and approaches for enabling Industry 5.0‐driven sustainable industrial transformation: A strategy roadmap
2022 Standout
Multimodal freight transportation planning: A literature review
2013 Standout
Remanufacturing for the automotive aftermarket-strategic factors: literature review and future research needs
2009
Formative Versus Reflective Indicators in Organizational Measure Development: A Comparison and Empirical Illustration
2006 Standout
Sustainable supply chain management with pricing, greening and governmental tariffs determining strategies: A game-theoretic approach
2017
The co-opetitive strategy of a closed-loop supply chain with remanufacturing
2011
Minimizing flow-time on a single machine with integer batch sizes
2004
Viability of remanufacturing practice: a strategic decision making framework for Chinese auto-parts companies
2014
Hybrid Genetic Bees Algorithm applied to single machine scheduling with earliness and tardiness penalties
2017
An organizational theoretic review of green supply chain management literature
2010 Standout
Issues in reverse supply chain, part III: classification and simple analysis
2009
Channel coordination in green supply chain management
2012
Intelligent systems in manufacturing: current developments and future prospects
2000
The Circular Economy – A new sustainability paradigm?
2016 Standout
Managing Disruption Risks in Supply Chains
2005 Standout
Batch scheduling with controllable setup and processing times to minimize total completion time
2003
Consumer Returns Policies and Supply Chain Performance
2008
A literature review and perspectives in reverse logistics
2015
The flying sidekick traveling salesman problem: Optimization of drone-assisted parcel delivery
2015 Standout
Ship Routing and Scheduling: Status and Perspectives
2004 Standout
Minimizing the Number of Late Jobs under the Group Technology Assumption
1999
Better Demand Signal, Better Decisions? Evaluation of Big Data in a Licensed Remanufacturing Supply Chain with Environmental Risk Considerations
2017
Parallel machine batching and scheduling with deadlines
2000
Sequence-dependent group scheduling problems in flexible flow shops
2005
Minimizing sum of completion times on a single machine with sequence-dependent family setup times
2005
Robust and resilient strategies for managing supply disruptions in an agribusiness supply chain
2017
Research on Big Data Digging of Hot Topics about Recycled Water Use on Micro-Blog Based on Particle Swarm Optimization
2018 Standout
Scheduling two-component products on parallel machines
2004
A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups
2004
A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
2005
Operation patterns analysis of automotive components remanufacturing industry development in China
2017
Batching identical jobs
2000
Scheduling a Single Server in a Two-machine Flow Shop
2003
Incentive and production decisions for remanufacturing operations
2009
Scheduling families of jobs with setup times
1997
Scheduling non-similar groups on a flow line: multiple group setups
2004
Diversity of eco-innovations: Reflections from selected case studies
2010 Standout
Earliness–tardiness scheduling with setup considerations
2004
On the integration of planning and environmental impact assessment for a WEEE transportation network—A case study
2010
A review on circular economy: the expected transition to a balanced interplay of environmental and economic systems
2015 Standout
Earliness/tardiness scheduling with a common due date and family setups
2004
Supply chain analysis under green sensitive consumer demand and cost sharing contract
2014 Standout
Heuristic methods for the identical parallel machine flowtime problem with set-up times
2004
A review of scheduling research involving setup considerations
1999
Multi-objective lot splitting for a single productm-machine flowshop line
2004
A survey of scheduling problems with setup times or costs
2006 Standout
Green supply chain management: A review and bibliometric analysis
2015 Standout
Works of Scott Webster being referenced
Competitive strategy in remanufacturing and the impact of take‐back laws
2007
A general lower bound for the makespan problem
1996
Dynamic programming algorithms for scheduling parallel machines with family setup times
2001
A priority rule for minimizing weighted flow time in a class of parallel machine scheduling problems
1993
Weighted flow time bounds for scheduling identical processors
1995
An evaluation of worker cross training and flexible workdays in job shops
2007
The complexity of scheduling job families about a common due date
1997
Impact of sourcing flexibility on the outsourcing of services under demand uncertainty
2011
PRACTICE‐FOCUSED RESEARCH ISSUES FOR SCHEDULING SYSTEMS*
2002
Note on “Parallel Machine Scheduling with Batch Setup Times”
1998
New Bounds for the Identical Parallel Processor Weighted Flow Time Problem
1992
A genetic algorithm for scheduling job families on a single machine with arbitrary earliness/tardiness penalties and an unrestricted common due date
1998
Dynamic Pricing and Lead‐Time Policies for Make‐to‐Order Systems*
2002
Channel Coordination for a Supply Chain with a Risk‐Neutral Manufacturer and a Loss‐Averse Retailer*
2007
A Risk-free Perishable Item Returns Policy
2000
Bicriteria optimisation of the makespan and mean flowtime on two identical parallel machines
2000
The Impact of Yield-Dependent Trading Costs on Pricing and Production Planning Under Supply Uncertainty
2011
Competition in remanufacturing and the effects of government subsidies
2007
Scheduling Groups of Jobs on a Single Machine
1995
Markdown money contracts for perishable goods with clearance pricing
2008
The loss-averse newsvendor problem☆
2006
Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment
1999
Scheduling job families about an unrestricted common due date on a single machine
1997
A Comparison of Buyback and Trade‐In Policies to Acquire Used Products for Remanufacturing
2017
Ordering and pricing policies in a manufacturing and distribution supply chain for fashion products
2008
Would a risk-averse newsvendor order less at a higher selling price?
2008
Scheduling parallel machines to minimize weighted flowtime with family set-up times
2003