Immediate Impact
49 standout
Citing Papers
A disjunctive graph-based metaheuristic for flexible job-shop scheduling problems considering fixture shortages in customized manufacturing systems
2025 Standout
A Review on Edge Large Language Models: Design, Execution, and Applications
2025 Standout
Works of Jae-Min Yu being referenced
A priority scheduling approach for flexible job shops with multiple process plans
2013
Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures
2013
Author Peers
| Author | Last Decade | Papers | Cites | |||
|---|---|---|---|---|---|---|
| Jae-Min Yu | 234 | 36 | 54 | 14 | 302 | |
| Shengping Lv | 143 | 23 | 46 | 18 | 290 | |
| Richard Sharpe | 183 | 25 | 73 | 11 | 313 | |
| Tianguo Jin | 197 | 52 | 33 | 21 | 356 | |
| Gülesin Sena Daş | 150 | 10 | 27 | 17 | 268 | |
| Ramasamy Panneerselvam | 225 | 13 | 45 | 20 | 319 | |
| Hossein Akbaripour | 136 | 26 | 31 | 12 | 270 | |
| L. Zhang | 113 | 34 | 23 | 12 | 323 | |
| Rui Borges Lopes | 198 | 17 | 57 | 28 | 305 | |
| Abdelkader Sbihi | 209 | 121 | 53 | 16 | 342 | |
| Hongchao Fang | 85 | 8 | 52 | 13 | 321 |
All Works
Loading papers...