Citation Impact
Citing Papers
A Network Analysis of an Inpatient/Outpatient Department
1980
PSPLIB - A project scheduling problem library
1997 Standout
R&D Project Planning with Q-GERT Network Modeling and Simulation
1980
Dynamic Set-Covering for Real-Time Multiple Fault Diagnosis With Delayed Test Outcomes
2012
System-Reliability Evaluation Techniques for Complex/Large SystemsߞA Review
1981
Efficient priority rules for the resource‐constrained project scheduling problem
1996
Activity nets: A guided tour through some recent developments
1995
An integrated survey of deterministic project scheduling
2001
Application of Analytical Hierarchy Process in OperationsManagement
1990
Global supplier development considering risk factors using fuzzy extended AHP-based approach
2005 Standout
A survey of variants and extensions of the resource-constrained project scheduling problem
2009 Standout
Chemical-Reaction-Inspired Metaheuristic for Optimization
2009 Standout
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
1996 Standout
A Dynamic-Bayesian-Network-Based Fault Diagnosis Methodology Considering Transient and Intermittent Faults
2016 Standout
Survey of multi-objective optimization methods for engineering
2004 Standout
Fault Tree Analysis, Methods, and Applications ߝ A Review
1985 Standout
Experimental investigation of heuristics for resource-constrained project scheduling: An update
2005 Standout
Resource-constrained project scheduling: A survey of recent developments
1998 Standout
Harris hawks optimization: Algorithm and applications
2019 Standout
GA-Based Multicriteria Optimal Model for Construction Scheduling
1999
Towards the standardization of performance measures for project scheduling heuristics
1988
New Benchmark Results for the Resource-Constrained Project Scheduling Problem
1997
OUTPATIENT SCHEDULING IN HEALTH CARE: A REVIEW OF LITERATURE
2003 Standout
On Uncertainty, Ambiguity, and Complexity in Project Management
2002 Standout
Algorithms for project scheduling with resource constraints
1982
Resource-constrained project scheduling: Notation, classification, models, and methods
1999 Standout
A Robust Genetic Algorithm for Resource Allocation in Project Scheduling
2001
A classification of assembly line balancing problems
2006 Standout
Resource constrained scheduling of hierarchically structured design activity networks
1995
Uniform Assembly Line Balancing with Stochastic Task Timesin Just‐in‐time Manufacturing
1991
Computational survey of univariate and multivariate learning curve models
1992 Standout
Evolutionary and population-based methods versus constructive search strategies in dynamic combinatorial optimization
2017
Works of Gary E. Whitehouse being referenced
Find Critical Path In An Arrow Diagram
1980
Solve Simple Assembly Line Balance Problems
1980
Meta-RaPS approach for the 0-1 Multidimensional Knapsack Problem
2004
Systems Analysis and Design Using Network Techniques
1975
An effective and simple heuristic for the set covering problem
2005
GERT, A Useful Technique for Analyzing Reliability Problems
1970
GERT, A Useful Technique for Analyzing Reliability Problems
1970
Systems Analysis and Design Using Network Techniques.
1975
GENRES: An extension of Brooks Algorithm for project scheduling with resource constraints
1979
A study of combining heuristics for scheduling projects with limited multiple resources
1988