Immediate Impact
58 standout
Citing Papers
Optimizing Dynamic Flexible Job Shop Scheduling Using an Evolutionary Multitask Optimization Framework and Genetic Programming
2025 Standout
Machine-fixture-pallet resources constrained flexible job shop scheduling considering loading and unloading times under pallet automation system
2024 Standout
Works of Débora P. Ronconi being referenced
List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility
2015
A Branch-and-Bound Algorithm to Minimize the Makespan in a Flowshop with Blocking
2005
Author Peers
| Author | Last Decade | Papers | Cites | |||||
|---|---|---|---|---|---|---|---|---|
| Débora P. Ronconi | 882 | 68 | 90 | 126 | 108 | 37 | 955 | |
| T. N. Wong | 757 | 37 | 73 | 38 | 57 | 33 | 885 | |
| Peng Si Ow | 679 | 107 | 32 | 305 | 175 | 19 | 858 | |
| Franklina M. B. Toledo | 714 | 157 | 73 | 37 | 57 | 45 | 848 | |
| Gordon Wilfong | 245 | 31 | 56 | 532 | 147 | 40 | 949 | |
| François Vanderbeck | 887 | 50 | 85 | 170 | 56 | 29 | 1.1k | |
| Marc E. Posner | 893 | 123 | 60 | 462 | 51 | 41 | 1.1k | |
| Andreas C. Nearchou | 722 | 33 | 175 | 46 | 136 | 50 | 990 | |
| Wolfgang Domschke | 722 | 54 | 71 | 111 | 78 | 34 | 887 | |
| Krzysztof Fleszar | 679 | 34 | 33 | 64 | 83 | 21 | 766 | |
| Andrea Pacifici | 793 | 116 | 40 | 429 | 59 | 63 | 980 |
All Works
Login with ORCID to disown or claim papers
Loading papers...