Immediate Impact
40 standout
Citing Papers
A disjunctive graph-based metaheuristic for flexible job-shop scheduling problems considering fixture shortages in customized manufacturing systems
2025 Standout
Optimizing Dynamic Flexible Job Shop Scheduling Using an Evolutionary Multitask Optimization Framework and Genetic Programming
2025 Standout
Works of Atabak Elmi being referenced
Cyclic job shop robotic cell scheduling problem: Ant colony optimization
2017
A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
2013
Author Peers
| Author | Last Decade | Papers | Cites | ||||
|---|---|---|---|---|---|---|---|
| Atabak Elmi | 341 | 48 | 10 | 23 | 15 | 371 | |
| José Soeiro Ferreira | 354 | 19 | 14 | 18 | 20 | 395 | |
| Jae-Min Yu | 234 | 36 | 14 | 23 | 14 | 302 | |
| Yi Wang | 311 | 93 | 13 | 40 | 17 | 375 | |
| Xingye Dong | 304 | 39 | 12 | 66 | 8 | 328 | |
| Chang Lv | 226 | 68 | 4 | 28 | 14 | 358 | |
| Junwen Ding | 255 | 47 | 9 | 55 | 21 | 302 | |
| Jiaxin Fan | 334 | 33 | 8 | 33 | 19 | 392 | |
| Zhao Peng | 253 | 26 | 19 | 45 | 23 | 338 | |
| Rami Musa | 276 | 26 | 18 | 40 | 10 | 306 | |
| Xiaolong Chen | 295 | 45 | 3 | 45 | 13 | 362 |
All Works
Login with ORCID to disown or claim papers
Loading papers...