Standout Papers

A survey of scheduling problems with setup times or costs 2006 2026 2012 2019 860
  1. A survey of scheduling problems with setup times or costs (2006)
    Ali Allahverdi, C.T. Ng et al. European Journal of Operational Research

Citation Impact

Citing Papers

Particle Swarm Optimization Algorithm and Its Applications: A Systematic Review
2022 Standout
Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future
2014 Standout
One-part alkali-activated materials: A review
2017 Standout
The technological and economic prospects for CO2 utilization and removal
2019 StandoutNature
A Novel Artificial Bee Colony Algorithm Based on Modified Search Equation and Orthogonal Learning
2012 Standout
Towards sustainable concrete
2017 Standout
Fire resistance of high-volume fly ash mortars with nanosilica addition
2012
Assessment of mechanical strength of nano silica concrete (NSC) subjected to elevated temperatures
2018
Alkali-activated materials
2017 Standout
Emerging Engineered Wood for Building Applications
2022 Standout
Solution business models: Transformation along four continua
2013
Tungsten tailing powders activated for use as cementitious material
2015
Durability of alkali-activated binders: A clear advantage over Portland cement or an unproven issue?
2011
Geopolymer foam concrete: An emerging material for sustainable construction
2014
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
2009
A discrete differential evolution algorithm for the permutation flowshop scheduling problem
2008
The effect of different dispersants on the physical properties of nano CoAl2O4 ceramic ink-jet ink
2015
Geopolymer concrete: A review of some recent developments
2015 Standout
Weighted Superposition Attraction (WSA): A swarm intelligence algorithm for optimization problems – Part 1: Unconstrained optimization
2015
Parameter estimation of solar cells and modules using an improved adaptive differential evolution algorithm
2013
Utilization of volcanic ashes for the production of geopolymers cured at ambient temperature
2013
Structuring servitization-related research
2018 Standout
Differential Evolution: A Survey of the State-of-the-Art
2010 Standout
Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem☆
2009
Fly ash-based geopolymers: The relationship between composition, pore structure and efflorescence
2014
Effect of incorporation of surface treated zinc oxide on non-isocyanate polyurethane based nano-composite coatings
2013
One‐Part Geopolymers Based on Thermally Treated Red Mud/NaOH Blends
2014
Effect of ultrasonication energy on engineering properties of carbon nanotube reinforced cement pastes
2015 Standout
Review of the main developments in the analytic hierarchy process
2011 Standout
Dynamic scheduling for flexible job shop with new job insertions by deep reinforcement learning
2020 Standout
Performance enhancement of recycled concrete aggregate – A review
2015 Standout
A distributed approach solving partially flexible job-shop scheduling problem with a Q-learning effect
2017
A discrete differential evolution algorithm for the single machine total weighted tardiness problem with sequence dependent setup times
2008
Dynamic flexible flow shop problems—Scheduling heuristics vs. autonomous control
2010
Carbon nanotubes (CNTs) in ultra-high performance concrete (UHPC): Dispersion, mechanical properties, and electromagnetic interference (EMI) shielding effectiveness (SE)
2020 Standout
PSO-based algorithm for home care worker scheduling in the UK
2007
Composition and distribution of microbial communities in natural river wetlands and corresponding constructed wetlands
2016 Standout
Thermal Activation of Albite for the Synthesis of One‐Part Mix Geopolymers
2011
Personnel scheduling: A literature review
2012 Standout
Beluga whale optimization: A novel nature-inspired metaheuristic algorithm
2022 Standout
Synthesis of geopolymer from spent FCC: Effect of SiO2/Al2O
2015
Servitization and deservitization: Overview, concepts, and definitions
2017 Standout
Investigations on scalable fabrication procedures for self-sensing carbon nanotube cement-matrix composites for SHM applications
2015 Standout
Advances in understanding alkali-activated materials
2015 Standout
Optimal parameters estimation and input subset for grey model based on chaotic particle swarm optimization algorithm
2010
A solution business model: Capabilities and management practices for integrated solutions
2011
Construction and demolition waste generation and properties of recycled aggregate concrete: A global perspective
2018 Standout
A survey of variants and extensions of the resource-constrained project scheduling problem
2009 Standout
Two-stage teaching-learning-based optimization method for flexible job-shop scheduling under machine breakdown
2018
Evaluation approach for the identification of promising methods to couple central planning and autonomous control
2015
Micromechanics-based investigation of a sustainable ambient temperature cured one-part strain hardening geopolymer composite
2016
Generation of sulfate radical through heterogeneous catalysis for organic contaminants removal: Current development, challenges and prospects
2016 Standout
A comprehensive review of firefly algorithms
2013 Standout
Compressive strength, microstructure and hydration products of hybrid alkaline cements
2014
Parameters identification of photovoltaic models using an improved JAYA optimization algorithm
2017 Standout
Telephone Call Centers: Tutorial, Review, and Research Prospects
2003 Standout
A hybrid network intrusion detection system using simplified swarm optimization (SSO)
2012
Cyber-physical systems in manufacturing
2016 Standout
Functional Hydrogels as Wound Dressing to Enhance Wound Healing
2021 Standout
A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops
2011
ON THE COMPARISON OF QUEUEING SYSTEMS WITH THEIR FLUID LIMITS
2001
Cemented paste backfill for mineral tailings management: Review and future perspectives
2019 Standout
Effect of nano-silica in concrete; a review
2021 Standout
Issues in reverse supply chains, part I: end‐of‐life product recovery and inventory management – an overview
2008
Synthesis of heat and ambient cured one-part geopolymer mixes with different grades of sodium silicate
2015
Using a Grey model optimized by Differential Evolution algorithm to forecast the per capita annual net income of rural households in China
2011 Standout
Geopolymers and other alkali activated materials: why, how, and what?
2013
Mechanical properties of concrete at high temperature—A review
2015 Standout
Managing and modelling general resource transfers in (multi-)project scheduling
2008
Particle Swarm Optimization: A Comprehensive Survey
2022 Standout
Durability of red mud-fly ash based geopolymer and leaching behavior of heavy metals in sulfuric acid solutions and deionized water
2016
Optimal policies for scheduling repairs and allocating heterogeneous servers
1996
Status and future scope of hydrogels in wound healing: Synthesis, materials and evaluation
2020
The Arithmetic Optimization Algorithm
2021 Standout
Synthesis and strength optimization of one-part geopolymer based on red mud
2016
Blockchain-oriented dynamic modelling of smart contract design and execution in the supply chain
2019 Standout
Optimal policies for scheduling repairs and allocating heterogeneous servers
1996
The hybrid flow shop scheduling problem
2009
Polyurethane Foams: Past, Present, and Future
2018 Standout
Issues in reverse supply chain, part III: classification and simple analysis
2009
Beneficial role of nanosilica in cement based materials – A review
2013
Cemdata18: A chemical thermodynamic database for hydrated Portland cements and alkali-activated materials
2018 Standout
Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times
2002
Forecasting China's electricity consumption using a new grey prediction model
2018 Standout
Dominance rule and opposition-based particle swarm optimization for two-stage assembly scheduling with time cumulated learning effect
2018
Nano reinforced cement and concrete composites and new perspective from graphene oxide
2014
Threat of Adversarial Attacks on Deep Learning in Computer Vision: A Survey
2018 Standout
3D printing of ceramics: A review
2018 Standout
Influence of mechanical and chemical activation on the hydraulic properties of gamma dicalcium silicate
2013
Intrusion detection system: A comprehensive review
2012 Standout
A mathematical model for the management of a Service Center
2011
A new particle swarm optimization for the open shop scheduling problem
2007
A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems
2008
A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints
2016
Queueing model for call blending in call centers
2003
Parameter adaptation-based ant colony optimization with dynamic hybrid mechanism
2022 Standout
A new hybrid ant colony optimization algorithm for solving the no-wait flow shop scheduling problems
2018
Task Scheduling in Cloud Computing based on Meta-heuristics: Review, Taxonomy, Open Challenges, and Future Trends
2021
Using analytic hierarchy process and particle swarm optimization algorithm for evaluating product plans
2009
Project scheduling with finite or infinite number of activity processing modes – A survey
2010
Mechanics Design in Cellulose‐Enabled High‐Performance Functional Materials
2020
A survey of maintenance policies of deteriorating systems
2002 Standout
Benefits of Sealed-Curing on Compressive Strength of Fly Ash-Based Geopolymers
2016
Synthesis and use of bimetals and bimetal oxides in contaminants removal from water: a review
2015
Machine learning at the service of meta-heuristics for solving combinatorial optimization problems: A state-of-the-art
2021
Ant colony optimization theory: A survey
2005 Standout
A review of dispersion of nanoparticles in cementitious matrices: Nanoparticle geometry perspective
2017
A DE-based approach to no-wait flow-shop scheduling
2009
Geopolymers and Related Alkali-Activated Materials
2014 Standout

Works of Ali Allahverdi being referenced

A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
2004
Stochastic Scheduling and Dynamic Programming
1996
EFFECTS OF BLAST-FURNACE SLAG ON NATURAL POZZOLAN-BASED GEOPOLYMER CEMENT
2011
No-wait flowshops with bicriteria of makespan and maximum lateness
2003
The third comprehensive survey on scheduling problems with setup times/costs
2015
Hydrogels as intelligent materials: A brief review of synthesis, properties and applications
2018
Stochastic Scheduling and Dynamic Programming.
1996
Batching deteriorating items with applications in computer communication and reverse logistics
2006
Dual criteria scheduling on a two-machine flowshop subject to random breakdowns
1998
Self-compacting concrete containing different powders at elevated temperatures – Mechanical properties and changes in the phase composition of the paste
2010
Some effective heuristics for no-wait flowshops with setup times to minimize total completion time
2007
Optimal selection of module instances for modular products in reconfigurable manufacturing systems
2003
New heuristics for m-machine no-wait flowshop to minimize total completion time
2004
Characterizing thermal behavior of ceramic glaze containing nano-sized cobalt-aluminate pigment by hot stage microscopy
2011
The significance of reducing setup times/setup costs
2006
Accelerated biodegradation of cured cement paste by Thiobacillus species under simulation condition
2013
A survey of scheduling problems with no-wait in process
2016
Mechanical activation of chemically activated high phosphorous slag content cement
2013
Taftan Pozzolan-Based Geopolymer Cement
2008
Total completion time with makespan constraint in no-wait flowshops with setup times
2014
Effects of curing time and temperature on strength development of inorganic polymeric binder based on natural pozzolan
2009
CoAl 2 O 4 Nano Pigment Obtained by Combustion Synthesis
2012
Scheduling multi-stage parallel-processor services to minimize average response time
2005
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
2006
The effect of nanosilica on mechanical, thermal and morphological properties of epoxy coating
2012
Effective dispersion of nano-TiO2 powder for enhancement of photocatalytic properties in cement mixes
2013
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
1996
No-wait flowshop with separate setup times to minimize maximum lateness
2006
An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time
2013
Two-machine ordered flowshop scheduling under random breakdowns
1994
New heuristics to minimize total completion time in m-machine flowshops
2002
New heuristics for no-wait flowshops to minimize makespan
2003
Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
1995
Efflorescence control in geopolymer binders based on natural pozzolan
2011
A review of scheduling research involving setup considerations
1999
A survey of scheduling problems with setup times or costs
2006 Standout
Rankless by CCL
2026